Bally Refrigerated Boxes Modular Buildings User Manual
Modular buildings, Installation manual

REV: 1/2013
Instruction Manual IM-238-94 2013 © Bally Refrigerated Boxes, Inc. 1
Modular Buildings
Installation Manual
1. Introduction
2
2. Marking Installation Area
2
3. Speed-Lok Operation
2
4. 'Z' Base Trim
3
5. Less Floor Walk-Ins
3
6. Floor Panel Installation
4
7. With-Floor Installation
4
8. Door Panel Installation
4
9. Multi-Compartment Walk-Ins
5
10. Interior Steel
5
11. Shear Plates
5
12. Batten Strips
5
13. High Wind Securing
6
14. Outdoor Considerations
6
15. Door Rain Shield
6
16. Wall Standards
6
17. Panel Penetrations
7
18. Prevent Vapor Leaks
7
19. Grounding
8
20. Broken or Stripped Locks
8
1-800-24 BALLY
Bally Refrigerated Boxes, Inc.
www.ballyrefboxes.com