Bally Refrigerated Boxes Walk-In Installation Manual User Manual
Installation manual, Pre-engineered walk-in coolers and freezers
UPDATED: 6/2014
Instruction Manual IM-268-11 2014© Bally Refrigerated Boxes, Inc. 1
Pre-Engineered Walk-In Coolers and Freezers
Installation Manual
Part One: The Bally Walk-In
1. Preparation for Installing the Walk-In
3
2. Operation of the Bally Speed-Lok
3
Part Two: Installation
1. Positioning
4
2. Walk-Ins with Screeds
4
3. Installing Less-Floor Walk-Ins
4
4. Door Installation
5
5. Installing With-Floor Walk-Ins
5
6. Vertical Panel Installation
5
7. Installing Multi-Compartment Walk-Ins
6
Part Three: Other Important Information
1. Preventing Vapor Leaks
6
2. Partition Wall Caulking
7
3. Air Gap Circulation Recommendation
7
4. Making holes for Refrigeration Tubing and Electrical Lines
7
5. Making Electrical Connections to Entrance Doors and Vapor-proof Lights
7
Part Four: Completing the Bally Installation
Completing Installation of the Walk-In
8
1-800-24BALLY | [email protected]