beautypg.com

Prime pump – TapeTech CFFULL Cont. Flow Full Bundle User Manual

Page 10

background image

Prime Pump

10

3A0245A

Prime Pump

1.

Mix material in separate bucket.

2.

Add 1-2 gallons (4-8 liters) of material to hopper.

3.

Place prime hose deflector into hopper or empty
bucket. NOTE: Keep deflector shield wet once it is in
use.

4.

Turn power ON and turn prime valve handle to
PRIME. Turn flow control knob clockwise to start
pumping.

5.

Install material screen (P).

6.

Add the remaining material to hopper.

7.

After unit is primed, turn prime valve handle to
APPLY FINISH position.

NOTICE

Do not use with quick-set materials. They can harden
inside the unit and hose.

ti15747a

ti15613a

ti8794a

ti15746a

ti11670a

ti15612a