beautypg.com

Storage, Cleanup – TapeTech CFFULL Cont. Flow Full Bundle User Manual

Page 14

background image

Storage

14

3A0245A

Storage

1.

Perform Pressure Relief Procedure, page 6 (prime
valve handle in down position). Leave prime valve
handle in PRESSURE RELIEF position.

2.

Spray water mist on top of any remaining material in
the hopper and cover hopper with lid.

3.

Cover valve and tool ends to keep joint compound
from hardening.

4.

Submerge deflector of prime hose in bucket or cover
to keep join compound from hardening.

Cleanup

1.

Perform Pressure Relief Procedure, page 6 (prime
valve handle in down position).

2.

Flush unused material from hopper, hose, and
prime hose.

3.

Remove remaining material from hopper.

4.

Turn pump control fully counter-clockwise to shut
pump off.

5.

Fill material hopper with water and run pump to
flush unit. Run water through material hose, tools
and drain line thoroughly flush system.

6.

Clean all tools.

7.

Remove drain plug from hopper. Flush with water.
Clean and install drain plug.

NOTICE

Do not use with quick-set materials. They can harden
inside the unit and hose.

bar/psi

ti15614a

ti8794a

ti14877a

ti8793a

ti11670a

ti14879a