Mise en route / start-up / inbetriebsetzung – Sulky VISION 2 WPB User Manual
Page 43
![background image](/manuals/573511/43/background.png)
43
GB
Mise en route / Start-up / Inbetriebsetzung
•
1
1
•
Select the EPAN menu
•
2
2
•
Check that: • the fertiliser selection is correct,
• hydraulic shutters are closed,
• the correction mode is correct (Dynamic or Static).
•
3
3
•
Select the dose/ha:
use the numeric pad directly, validate by
.
•
4
4
•
Start spreading and select the correction (Test or Auto).
•
5
5
•
You are spreading in DPA mode.
You can modulate the dose/ha: select
or
and return to baseline flow rate by selecting
.
•
6
6
•
You can start the TRIBORD or select
to modulate the RH side or select
to modulate
the LH side.
Return to the same the same left/right dose by selecting
.
•
1
1
•
Select the INFO menu.
•
2
2
•
Select the PAR/TOT mode.
•
3
3
•
Reset each counter to zero with the RAZ function.
•
4
4
•
As soon as you hear an alarm sound or see a bell appear on the screen, select
to determine the cause[s].
Select OK to return to the baseline menu.
•
5
5
•
Select
to save.
A
B
C
•
1
1
•
Select the REG menu.
•
2
2
•
Make sure that all parameters are correctly entered and saved : rate coefficient
and working width .
•
3
3
•
Select your weighing method
.
•
4
4
•
Select TARE and reset it to zero.
•
5
5
•
Select your fertilisers
.
1
3