Remote system, Installation – Sportsliter Solutions Remote System User Manual
Page 4

REMOTE SYSTEM
INSTALLATION
Direct Embedded Foundation Design Sample (Fig. 1)
(This is a samply only, your SLS installation will require it’s own design)
SURFACE
POLE
PLAYING SURFACE
ELEVATION
THIS DIMENSION MUST BE
HELD TO WITHIN + 3 FEET.
X
STEEL
ANC
HO
R
BA
SE
P
O
LE
, C
A
P
PL
A
TE
M
O
UN
TE
D
CR
O
SS
AR
M
D
IR
EC
T
EM
BE
DD
ED
P
O
LE
,
STEEL
O
R
C
O
NCR
ET
E
, CA
P
PL
A
TE
CR
O
SS
AR
M
D
IR
EC
T
EM
BE
DD
ED
P
O
LE
, S
TE
EL
O
R
C
O
NC
RETE
, C
LA
M
P-
O
N
C
RO
SS
AR
M
2’
X
3’
X
CROSSARM ASSEMBLY
MOUNTING ELEVATION
EMBEDMENT
Pole Elevations (Fig. 3)
3
BASEBALL & SOFTBALL LAYOUTS
45°
TYP.
CROSSARM ASSEMBLY
VEWING
POINT
TYPICAL LAYOUTS ARE 4 OR 6 POLES PER FIELD.
VARIOUS POLE LOCATIONS SHOWN.
90°
TYP.
POLE.
HANDHOLE AND REMOTE
HEADS TO BE ON PLAYING
FIELD SIDE (TYP.)
HOME PLATE
PARALLEL TO BASE LINE UNLESS NOTED
FOOTBALL, SOCCER & TENNIS LAYOUTS
PARALLEL TO SIDE LINE UNLESS NOTED
Pole Location / Alignment Details (Fig. 2)
NOTES:
Identify pole locations on site per Hubbell Application Engineering Documentation.
Insure that all viewing points are a safe distance from poles during the erection process.
A distance equal to 1½ mounting heights minimum is recommended.
Refer to
Figs 4 & 5 for additional alignment details.