Warning, Commissioning report, As per i&o manual and local codes – Schwank comfortSchwank - Powder STW-JZ User Manual
Page 42
42
SPW-JZ, STW-JZ(2) / IWP, IW(2) I&O Manual
IM101229
RL: 13A
RD: MAY 2014
24. START-UP / COMMISSIONING SHEET
COMMISSIONING REPORT
CONTRACTOR NAME: ................................................................................DATE................................
ADDRESS:............................................................................................................................................
............................................................................................................................................................
CITY:........................................................................................
PHONE:...................................................................................
CELL: .....................................................................................
JOB SITE......................................................................................................CITY................................
HEATER MODEL NUMBER:.................................................................................
HEATER SERIAL NUMBER: ................................................................................
AS PER I&O MANUAL AND LOCAL CODES
THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED PRIOR TO
SHIPMENT. HOWEVER, THIS APPLIANCE IS NOT “PLUG & PLAY”. IT RE-
QUIRES COMMISSIONING AND FIELD ADJUSTMENT / SPECIFICATIONS
CONFIRMATION TO ENSURE SAFE AND EFFICIENT OPERATION.
TO ENSURE THAT SITE CONDITIONS ARE COMPATIBLE WITH THE HEATER’S PER-
FORMANCE AND TO ALLEVIATE NUISANCE CALL-BACKS, THE FOLLOWING START-
UP NEEDS TO BE COMPLETED BY THE QUALIFIED GAS INSTALLER.
A TECHNICIAN CALLING FOR TECHNICAL SUPPORT MUST PROVIDE THE
INFORMATION FROM THE COMPLETED COMMISSIONING REPORT ON
THE NEXT PAGE
FAX COMPLETED REPORT TO TECHNICAL SERVICES:
FAX 1-866-361-0523,
VOICE 1-877-446-3727
WARNING
START UP ‘SMOKE’
During start up, material coatings used in the production process of tubes and reflectors will
“burn off” and create smoke during the first hour of operation. This is temporary and normal.
Please ensure that there is sufficient ventilation to adequately clear the smoke from the space.
Notify site and safety personnel to ensure that alarm systems are not unduly activated.
Located on burner rating plate
Located on burner rating plate