beautypg.com

Electrical installation, Primary electrical installation – SATEC EM720 Installation Manual User Manual

Page 9

background image

Chapter 2 Installation

5

Electrical Installation

Before installing, ensure that all incoming power sources are shut
OFF. Failure to observe this practice can result in serious or even fatal
injury and damage to equipment.

Primary electrical installation

Before connecting the

EM720

to the power measurement terminals, remove the

EM720

front cover,

then

install the memory backup Lithium Battery backup (MBB) and Battery Pack Backup Power Supply (BPS)

Figure 3: Memory Backup Lithium Battery and Battery Pack Installation

Before installing the instrument, ensure that the Battery Pack Backup
Power Supply (BPS) is connected.

The BPS must be charged for a period of 16 consecutive hours before
the installation.

Charging the BPS, connect the instrument to a three phase Power
source, according to the instrument inputs rating, to the Voltage

Inputs: make sure there are no plug-in modules.