Operation pre-starting checks: annual – MacDon 9352i SP User Manual
Page 32

Form # 147141
Issue 02/06 Web Rev_01
30
OPERATION
Pre-Starting Checks: Annual
Do the following at the start of each operating
season:
CAUTION:
1. Review the Operator's Manual to refresh
your memory on safety and operating
recommendations.
2. Review all safety signs and other decals on
the windrower and note hazard areas.
3. Be sure all shields and guards are properly
installed and secured. Never alter or
remove safety equipment.
4. Re-acquaint yourself with the controls
before beginning operation.
5. Store a properly stocked first aid kit and
charged fire extinguisher on the
windrower.
Also:
6. Drain off excess hydraulic oil added for stor-
age. See "Hydraulic System" in Maintenance/
Service section.
7. Remove plastic bags and/or tape from all
sealed openings (air cleaner intake, exhaust
pipe, fuel tank).
8. Charge battery and install. Be sure terminals
are clean and cables are connected securely.
9. Adjust tension on A/C compressor belt. See
Maintenance/Service section.
10.
Cycle blower switch to distribute A/C
refrigerant oil. See Maintenance/Service
section.
11. Perform all Annual maintenance. See Main-
tenance/Service section.