beautypg.com

Bryant 355CAV User Manual

Page 12

background image

12

CAP

PLUG

COLLECTOR BOX

DRAIN TUBE (BLUE &

WHITE STRIPED)

INDUCER HOUSING

(MOLDED) DRAIN

TUBE (VIOLET)

COLLECTOR BOX

TUBE (PINK)

COLLECTOR BOX

DRAIN TUBE (BLUE)

COLLECTOR BOX

TUBE EXTENSION

CONDENSATE

TRAP

COLLECTOR BOX

TUBE (GREEN)

COLLECTOR BOX

EXTENSION

DRAIN TUBE

DRAIN TUBE

COUPLING

AUXILIARY “J” BOX

A07278

Fig. 11 -- Horizontal Left Tube Configuration

b. Remove and discard UPPER (molded) inducer housing

drain tube which was previously connected to

condensate trap.

c. Install cap and clamp on UPPER inducer housing drain

connection where molded drain tube was removed.

d. Use inducer housing drain tube (violet label and

factory--supplied in loose parts bag) to connect LOWER

inducer housing drain connection to the condensate trap.

e. Connect inducer housing drain connection to

condensate trap.

(1.) Condensate Trap Located on Left Side of Casing

a. Determine appropriate length and cut.

b. connect tube to condensate trap.

c. Clamp tube to prevent any condensate leakage.

(2.) Condensate Trap Located on Right Side of Casing

a. Route inducer housing drain tube (violet label)

directly from inducer housing to condensate trap.

b. Determine appropriate length and cut.

c. Connect tube to condensate trap.

d. Clamp tube to prevent any condensate leakage.

3. Relief Port Tube

Refer to Pressure Switch Tubing section for connection

procedure.

Condensate Trap Field Drain Attachment

Refer to Condensate Drain section for recommendations and

procedures.

Pressure Switch Tubing

One collector box pressure tube (pink label) is factory connected to
the pressure switch for use when furnace is installed in UPFLOW

or HORIZONTAL LEFT applications.

The tube MUST be

disconnected and used or the condensate trap relief port tube. The

other collector box pressure tube (green label) which was factory
connected to the condensate trap relief port connection MUST be

connected to the pressure switch in DOWNFLOW or
HORIZONTAL RIGHT applications.
NOTE: See Fig. 9 or 10 or tube routing label on man furnace door
to check for proper connections.
Relocate tubes as described below.

1. Disconnect collector box pressure tube (pink label) attached

to pressure switch.

2. Extend collector box pressure tube (green label) which was

previously connected to condensate trap relief port
connection

by

splicing

to

small

diameter

tube

(factory--supplied in loose parts bag).

3. Connect collector box pressure tube (green label) to

pressure switch connection labeled COLLECTOR BOX.

4. Extend collector box pressure tube (pink label) which was

previously connected to pressure switch by splicing to
remaining small diameter tube (factory--supplied in loose

parts bag).

5. Route this extended tube (pink label) to condensate trap

relief port connection.

6. Determine appropriate length, cut, and connect tube.
7. Clamp tube to relief port connection.

Condensate Trap Freeze Protection

Refer to Condensate Drain Protection section for recommendations

and procedures.

HORIZONTAL LEFT (SUPPLY--AIR

DISCHARGE) APPLICATIONS

A horizontal left furnace application is where furnace blower is

located to the right of combustion and controls section of furnace,

and conditioned air is discharged to the left.

355C

A

V

355C

A

V