beautypg.com

Assembly and installation – Multiquip HDA-SERIES User Manual

Page 21

background image

HDA-SERIES WALK-BEHIND TROWEL — OPERATION AND PARTS MANUAL — REV. #9 (07/02/10) — PAGE 21

ASSEMBLY AND INSTALLATION

Pre-load Adjustment (Quick-Pitch™ Models Only)

1.

After the Quick-Pitch™ handle has been installed on the
trowel, spring pre-load adjustment will be required.

2.

Locate the adjustment screw on the underside of the handle
tube (Figure 15).

Figure 15. Pre-load Adjustment

Figure 14. Cable Yoke Attachment

3.

A

decal

has been placed on the side of the handle tube to

assist the user in the adjustment of the spring.

4.

Align the

arrow

on the adjustment screw with the letter "B"

COMBO

on the

decal

.

5.

Test the pitch control operation and adjust if necessary.

6.

If less operator effort is desired to pitch the blades, move
the indicator further in the "

COMBO

" direction.

5.

Insert the cable end through the yoke eyelet (Figure 14).
Tighten the first brass set nut by hand to remove all the
slack from the cable.

6

Using a wrench, tighten the second brass set nut up against
the yoke boss. This will lock the cable in place.

7.

Use a wrench and finish tightening the first brass set nut up
against the yoke boss.

2.

Lock the spring in the compressed position, by releasing
the blade pitch adjustment trigger, (Quick-Pitch™ model).

3.

Remove one brass set nut from the blade pitch cable end
as shown in (Figure 13).

4.

Thread the second brass set nut towards the cable as far
as possible.

Figure 13. Blade Pitch Cable

YOKE

THREAD CABLE END

THROUGH YOKE EYELET

TIGHTEN SECOND

BRASS SET NUT

AGAINST YOKE BOSS

USE A WRENCH TO

TIGHTEN FIRST BRASS

SET NUT AGAINST YOKE BOSS