beautypg.com

MTS Model 286-31 Transient Permeability Pore Pressure Intensifier User Manual

Page 48

background image

286.31 Transient Permeability Pore Pressure Intensifier

48

Running a Steady State Flow Test

Operation

13. Prepare to pressurize the fluid in the 286.31. Turn the Intensifier Fill valve

to the Close position.

14. Pressurize the fluid in the 286.31 by extending the Intensifier’s piston.

On the RSC, slowly turn the Manual Control to develop a positive
pressure.

As you purge the pore pressure lines, keep the pressure low but positive all
the time. Keep an eye on the pressure as you purge the lines.