C3.0 custom method development (purchased option) – MTS Criterion 40 - Installation and Commissioning Plan User Manual
Page 14

Installation and Commissioning Plan
14
MTS Criterion
TM
Series 40
C3.0 CUSTOM METHOD DEVELOPMENT (purchased option)
Item Description
Performed
On Site
C3.1
Develop method.
C3.2
Run and verify proper test operation.
C3.3
Demonstrate test method execution.
C3.4
Custom method edits or modifications:
• Adding or deleting hardware or software channels
• Adding or deleting calculations to a method
• Deleting inputs or input categories
• Using new inputs in an existing calculation
• Modifying an existing calculation
• Adding or deleting a configuration item in Define
• Modifying or creating new report or export
templates
• Adding/inserting or deleting new or existing test
segments
• Modifying the Data Collection tab of new or
existing test segments
C4.0 ON-SITE COMPUTER INTEGRATION (purchased option)
Item Description
Performed
On Site
C4.1
Load customer-supplied drivers for USB2 interface
hardware.
C4.2
Install MTS-supplied multi-channel hardware in PC if
purchased. (Purchased Option)
C4.3
Install testing software.
C4.4
Define and/or load system hardware parameters.
C4.5
Verify computer interface with MTS controller.