Installation and Commissioning Plan


MTS Criterion

TM

Series 40

13

PURCHASED OPTIONS: (Extends normal installation plan based

on the number of options purchased)

C1.0 ON-SITE CALIBRATIONS (purchased option)

Item Description

Performed

On Site

C1.1

Perform on-site system calibrations of load,

displacement, speed, extensometers or other accessories
or transducers.

C2.0 SYSTEM PERFORMANCE DEMONSTRATION (purchased option)

If you purchased an option to have MTS perform demonstrations on the installed

system that are in addition to the installation tasks described in paragraphs A2.0

and A3.0, see note below. For installation, demonstration, and training, the

customer will provide suitable specimens and other materials (for example, CO

2

,

liquid N

2

, temperature scanner, and so forth.) for the type of grips and system

purchased.

Item Description

Performed

On Site

C2.1

Demonstrate system performance of purchased option(s).

These demonstrations can include:

-

Verification of published or quoted MTS
performance specifications (see note below).

-

Verification

of

customer performance, accuracy, or

endurance specifications (see note below).

-

Performance of particular materials tests (see note
below).

Note: The request for quotation, including specifications or performance to be

demonstrated and clearly defined pass-fail criteria, as well as the MTS

proposal, are attached for reference.