MK Diamond MK-EZ Profile Milling Machine User Manual
Page 21

21
MK-EZ
PROFILER
SETUP
WATER PUMP SETUP FOR OPERATION
The Water Pump can be setup for operation in two ways: External Water Source or Re-circulation.
If cutting dry DO NOT connect the water pump.
NOTE:
NOTE: When using the re-circulation method, the water should be changed often for longer pump life.
RE-CIRCULATION
(A)
Ensure the Drain Plug is
installed in the Water Basin
(B)
Place the Water Pump in the
back of the Water Basin
1. Before powering or starting, check for damage that could prevent this equipment
from proper operation or performing it’s intended function. Check for binding and
alignment of moving parts. Check for damaged, broken, or missing parts.
2. Verify the On/Off switch is in the OFF position.
3. Before connecting the MK-EZ Profiler to a power supply, be sure the voltage, cycle
and phase of the job site power source meet the requirements.
CAUTION
PRE-START INSPECTION
Prior to beginning work, a pre-start inspection of the machine should be performed.