12. Pull cable on RIGHT side of worksurface to remove

slack from this portion. Tighten Stedge Clamp Screw (E9)
at this time.

13. Pull cable on LEFT side to remove slack. Do not

exceed spring tension (See Fig. #7). Tighten Stedge
Clamp Screw (E9).

14. Excess cable can be trimmed off leaving several

inches for future adjustments.

15. Straightedge may be locked in position by tightening

Knobs installed in Step #1 on both ends of Straightedge or
left loose to allow free movement up or down.

CABLE BRAKE
KNOB

LEFT CORNER
PLATE (E2)

SPRING LENGTH
NOT TO EXCEED

(CENTER SPRING BETWEEN CORNER PLATES)

PARALLEL

PARALLEL

Fig. #7

SPRING

ALIGN CABLE PARALLEL
WITH EDGE OF BOARD

PARALLEL

RIGHT CORNER
PLATE (E1)

(4)