beautypg.com

8 final works, Final works, Final works 8 – Lenze E94APNE User Manual

Page 46: 8final works, Danger

background image

Final works

8

l

46

EDK94PNE36 DE/EN/FR/ES/IT 3.1

8

Final works

{

Danger!

Dangerous voltage!
Depending on the device, the DC−bus voltage is still charged for
approx. 3 ... 20 min after switching off the mains voltage.

ƒ

The state of charge is not indicated!

ƒ

On synchronous motors self−discharge only starts after a possible feedback
operation has been completed.

ƒ

Discharging the DC bus in a controlled manner via the brake chopper/brake
resistor requires the external 24 V supply (

^ digital input DI1).

Possible consequences:

ƒ

Death or severe injuries when touching the terminals.

Protective measures:

ƒ

Before starting work on the system check that it is deenergised.

ƒ

Wait at least 3 minutes after switching off the mains voltage.

ƒ

Only remove deenergised standard devices from the installation backplanes
and do not touch any terminals.

How to proceed:

ƒ

Adjust the setting for the mains voltage/brake chopper threshold to the mains

Setting of mains voltage/brake chopper threshold

2

Pos.

3

U

LN

[V]

U

BRmax

[V]

1

500 V
480 V
400 V
230 V

ON

MAINS

12

500

790

OFF
OFF

480

765

ON

OFF

400

725

OFF

ON

230

390

ON
ON

94APNEDS01

ƒ

Switch on the 24 V supply

ƒ

Check the operating status by means of the LED display

If you want to continue commissioning:

ƒ

Switch on the mains