beautypg.com

Installation – Lenze EL 9800 Mounting Instructions User Manual

Page 34

background image

Installation

Mounting steps
Panel PC EL 2800 / EL 2850 / EL 5800 / EL 5820 / EL 5850 / EL 5870 / EL 9800

4

l

34

MA_ELx8xx DE/EN/FR/ES/IT 2.0

4.4.2

Panel PC EL 2800 / EL 2850 / EL 5800 / EL 5820 / EL 5850 / EL 5870 / EL 9800

Control board mounting
How to perform the installation:
1. Prepare the control board by cutting the mounting cutout and drilling the

mounting holes into it (

32).

2. Check that the gasket under the front panel is located correctly.
3. Place the device in the mounting cutout, secure it by hand against falling

down and screw the nuts and washers onto the threaded bolts.

4. Fit all screw clamp fixings as explained below:



‚

ƒ

ELx7xx−012

Insert the screw clamp fixing into the slot in the housing of the device
(see above figure).

Press the screw clamp fixing downwards, tilt it towards the housing
and check that it has firmly snapped into place.

Tighten the screw clamp fixing hand−tight with a screwdriver.

5. Check that the device is securely located in the mounting cutout and that

the front panel gasket is located correctly.

If necessary, realign the device/gasket.

If the gasket is not located correctly, protection class IP65 is not
achieved on the front of the device!

This manual is related to the following products: