beautypg.com

Bunn TNTF-3 User Manual

Page 27

background image

Page 27

SERVICE (cont.)

START SWITCH

FIG. 22 START SWITCH

P1370.40

Location:

The start switch is located in the front of the hood,

above and to the right of the brew funnel.

Test Procedure:
1. Disconnect the brewer from the power source.
2. Remove the wires from all four terminals.
3. Check for continuity across the two terminals on

the right side of the switch when it is held in the
lower position. Continuity must not be present
across these terminals in the upper position.

If continuity is present as described, proceed to #4.
If continuity is not present as described, replace the
switch.

4. Check for continuity across the two terminals on

the left side of the switch when it is held in the
lower position. Continuity must not be present
across these terminals in the upper position.

If continuity is present as described, reconnect the
wires, the switch is operating properly.
If continuity is not present as described, replace the
switch.

Removal and Replacement:
1. Remove the wires from the switch terminals.
2. Compress the clips inside the hood and gently

push the switch through the opening.

3. Push the new switch into the opening and spread

the clips to hold the switch captive in the hood.

4. Refer to Fig. 23 when reconnecting the wires.

FIG. 23 START SWITCH TERMINALS

P1368

WHI/ORN to Hot
Tea Brew Timer TL3

ORN to Iced Tea
Brew Timer TL3

YEL to Iced Tea
Brew Timer TL5

WHI/YEL to
Hot Tea Brew
Timer TL5

28201 081598

This manual is related to the following products: