beautypg.com

Bunn TNTF-3 User Manual

Page 15

background image

Page 15

Location:

Viewing the brewer from the rear, the hot tea brew

solenoid valve is mounted on the left side of the
mounting bracket.

Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the white/red and white/green wires

from the hot tea solenoid valve. With the ICED/
OFF/HOT switch in the "HOT" position press the
start switch.

3. With a voltmeter, check the voltage across the

white/red and white/green wires. Connect the
brewer to the power source. The indication must
be 120 volts ac for two wire 120 volt models and
three wire 120/208 volt models.

4. Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5
If voltage is not present as described, refer to

Wiring

Diagram

and check brewer wiring harness.

5. Check for continuity across the hot tea solenoid

valve coil terminals.

If continuity is present as described, reconnect the
white/red and white/green wires from the hot tea brew
timer.

FIG. 2 HOT TEA BREW SOLENOID VALVE

P1391.60

SERVICE (cont.)

BREW SOLENOID VALVE (HOT TEA)

If continuity is not present as described, replace the
solenoid valve.

6. Check the hot tea solenoid valve for coil action.

Connect the brewer to the power source. With
ICED/OFF/HOT switch in the "HOT" position press
the start switch and listen carefully in the vicinity
of the solenoid valve for a "clicking" sound as the
coil magnet attracts.

7. Disconnect the brewer from the power source.

If the sound is heard as described and water will not
pass through the solenoid valve, there may be a block-
age in the water line before the solenoid valve or, the
solenoid valve may require inspection for wear, and
removal of waterborne particles.
If the sound is not heard as described, replace the
solenoid valve.

Removal and Replacement:
1. Remove all wires from solenoid valves.
2. Turn off the water supply to the brewer.
3. Disconnect the water lines to and from the sole-

noid valves.

4. Remove the two #8-32 keps nuts holding the

mounting bracket to the brewer base.

5. Lift out the bracket.
6. Remove the two #10-32 slotted-head screws hold-

ing the hot tea solenoid valve to the mounting
bracket.

7. Securely install the new hot tea solenoid valve to

the mounting bracket.

8. Attach the mounting bracket to the brewer base.
9. Securely fasten the water lines to and from the

solenoid valves.

10. Refer to Fig.3 when reconnecting the wires.

FIG.3 SOLENOID VALVE TERMINALS

P1364

WHI/GRN to Hot Tea
Timer TL 4

WHI/RED to Hot Tea Timer TL 1

HOT TEA BREW
SOLENOID

ICED TEA BREW
SOLENOID

DILUTION
SOLENOID

WHI/VIO to Dilution Solenoid
WHI/VIO to Iced Tea Brew Timer TL 1

WHI/BLU to Iced Tea Timer TL 4

WHI/VIO to Iced Tea
Brew Timer TL 1

WHI/BLU to Iced
Tea Timer TL 4

28201 081598

This manual is related to the following products: