Bunn Trifecta 428220001E User Manual
Page 7

Page 7
COFFEE BREWING
1. Lift handle all the way up.
2. Remove cup assembly. Verify screen is locked into
grounds cup. Fig 1.
3. Fill with desired amount of ground coffee.
4. Place brew cup under brew chamber.
5. Place cup on drip tray .
6. Push handle all the way down to lock brew
chamber.
CONTINUED ON NEXT PAGE
DECAF
<- <- SELECT ->->
HOUSE SPECIAL
<- <- SELECT ->->
7. Scroll through recipes
using arrow buttons.
8. Press "SELECT"
button for your recipe.
9. A. If your brewing parameters are already set,
you may simply press the "BREW" button to start
a brew cycle.
B. To set up specific parameters for a particular
recipe, verify the recipe name is currently displayed.
Press "SELECT" , display will read "VOLUME".
42822.1 031210
FIG 1
See also other documents in the category Bunn Coffee machines:
- A-10 (12 pages)
- CEZ-TS (32 pages)
- CDBC-DV (37 pages)
- CWT APS (2 pages)
- CWT-TSR (33 pages)
- CWT-TS (24 pages)
- CRT5 CRTF5 (32 pages)
- CWTF-TSR-MV (31 pages)
- Dual Voltage Models Starting at Serial #CDBC024477 CDBCF TC (32 pages)
- CRT5 (32 pages)
- XL M-2 (2 pages)
- CDBCF15-TC (2 pages)
- C (59 pages)
- C (32 pages)
- ESPRESS ES2C (17 pages)
- VPR (17 pages)
- CRT5 (7 pages)
- WL2 (2 pages)
- A10 Automatic (6 pages)
- 120/208V (2 pages)
- EASY POUR WX1 (2 pages)
- ES2SA (35 pages)
- BT10 (3 pages)
- TU3Q-EZ (22 pages)
- TWIN APS (32 pages)
- DUAL GPR-DBC WITH SMART FUNNEL 41343 (38 pages)
- VP17A (24 pages)
- VP17A (8 pages)
- AXIOM BREWWISE 39131.0004B (19 pages)
- CEZF CDBC (36 pages)
- VLPF (28 pages)
- BX-B (16 pages)
- ESPRESS ES.1AF (12 pages)
- 37614 041410 (7 pages)
- CWTF TWIN (35 pages)
- VPR TC (12 pages)
- Titan Single Brewer (2 pages)
- AutoPOD Brewer 41167.0001B (13 pages)
- Coffee Warmer (3 pages)
- CWTF-TC (1 page)
- VPR VPS (5 pages)
- BTC (12 pages)
- Tiger Super Automatic Espresso Machine with Steam Wand XL S-2 (2 pages)
- CWT APS-DV (31 pages)
- Dual TF DBC (56 pages)