beautypg.com

How to install, Typical applications, Location 2 – Hydrolevel 250 Series User Manual

Page 5: Warning! 1

background image

HOW TO INSTALL

Reliable electronic design.

No replacement or rebuilding of floats or

mechanical parts.

No moving parts to stick, wear or hang-up.

Made in the U.S.A.

LISTED

Install the Safgard 250WC
in a 1" equalizing line
equipped with a blow-down
valve meeting applicable
state and local codes. The
control should be located

LOCATION

2

so that the "LOW WATER CUT-OFF LEVEL” marked on the control
casting is at least 1/2” above the lowest permissible water level as
specified by the boiler manufacturer.

WARNING!

1

Only qualified personnel may install or service the control
in accordance with local codes and ordinances. Read
instructions completely before proceeding.

To prevent electrical shock and
equipment damage, power must be off
during installation, inspection or servicing
of the control.
To prevent serious burns the boiler
should be thoroughly cooled before
installing or servicing control.

TYPICAL APPLICATIONS

LOW WATER CUT-OFF

LEVEL INDICATOR

Pump Control Low Water

Cut-Off Combination

120 VAC Operating Voltage

Max. Pressure 250 psi

250WC Series

1

2

3

4

5

1

Safgard 250 Pump Controller LWCO Combination

Safgard 270 High Water Alarm

3

Safgard 550 or 750 as Secondary LWCO

2

Incoming Water Line

Safgard 727 Tank Control

4

Safgard VF-120 Solenoid Valve

5