General Machine Products 89010 Breeze Micro Fiber Cable Blowing Machine User Manual
Page 7

Page 7 of 43
General Machine Products Co., Inc.
2. Critical points that dramatically affect the operation of the cable blowing
machine.
Pressure on the cable (Position of the close arm assy) should be set as per the instruc-
tions.
Rollers to be closed at all times when cable is installed into machine.
Cord seals in air chamber correctly fitted to provide good sealing.
Correct cable seal fitted.
Tube fully connected and pressure-tested.
Tube connecting fittings are suitable for operating at 220 PSI air pressure.
Tube clamp securely tightened.
Compressor capacity 220 PSI and suitable for size of tube being used.
Cable drum must be located directly behind and in line with the blowing machine.
Air chamber, drive rollers, cable guides, must be clean and free from debris, sludge, dirt,
water and lubricant.
The cable must be hand guided into the blowing machine through a dry clean cloth by the
operator wearing work gloves.
Ensure the compressed air supply is not applied to the cable until approximately 165 ft of
cable have been installed or the motor begins to labor.