O figure 6, Figure 6 ), Figure 6) – Despatch Stackable LCC/LCD-4 User Manual
Page 24: Caution
A
SSEMBLY
&
S
ETUP
Stackable LCC/LCD Oven
Owner’s Manual
24
Version 1.1
Copyright © 2012 by Despatch Industries.
All rights reserved. No part of the contents of this manual may be reproduced, copied or transmitted in any form or by any
means including graphic, electronic, or mechanical methods or photocopying, recording, or information storage and
retrieval systems without the written permission of Despatch Industries, unless for purchaser's personal use.
Nitrogen inlet
Water inlet
Flow-meter valve
Water outlet
Water drain
2. Install water connection for cooling coils to
WATER INLET
(Figure 6). Verify the valve on the
flowmeter is turned OFF, that is, fully clockwise.
Water pressure supplied to the oven must not exceed 100 psi
(6.89 bar). Despatch recommends installing a regulator to
prevent surging.
3. Check for leaks by slowly opening the valve on the flowmeter and allowing any air to bleed
out.
Caution!
Failure to allow air to bleed from the flowmeter may damage the
flowmeter. Bleed air from the flowmeter after every instance of
shutting off the water supply.
Nitrogen pressure supplied should be greater the 70 psi (4.83 bar) but
not more than 80 psi (5.52 bar).
Figure 6. LCC/LCD Connections Panel.