Installation

Equipment Description

This product is intended for use as an optional home

generator system which provides an alternate source

of electric power and to serve loads such as heating,

refrigeration systems, and communication systems that,

when stopped during any power outage, could cause

discomfort or inconvenience. This product does not qualify

for emergency standby as defined by NFPA 70 (NEC).

Customer Responsibilities

• Read and follow the instructions given in the Operator’s

Manual, especially the section regarding selecting

essential circuits.

• Follow a regular schedule in maintaining, caring for

and using your home generator, as specified in the

Operator’s Manual.

Installer Responsibilities

• Read and observe the safety rules.
• Install only an UL approved transfer switches that is

compatible with the home generator.

• Read and follow the instructions given in this

Installation and Start-up Manual.

IMPORTANT: The system is equipped with a water heater

that is activated when ambient temperature is less than 80°F

AND utility power is present at the transfer switch.

Unpacking Precautions

The unit is shipped ready for installation on a prepared

reinforced cement slab or engineered base. Avoid damage

from dropping, bumping, collision, etc. Store and unpack

carton with the proper side up, as noted on the shipping

carton.

Delivery Inspection

After removing the carton, carefully inspect the home

generator for any damage that may have occurred during

shipment.
IMPORTANT: If loss or damage is noted at time of delivery,

have the person(s) making delivery note all damage on the

freight bill and affix his signature under the consignor’s

memo of loss or damage. If loss or damage is noted after

delivery, separate the damaged materials and contact the

carrier for claim procedures. Missing or damaged parts are

not warranted.

Shipment Contents

The home generator system is supplied with:
• Home generator
• Fully-serviced coolant system
• Fully-serviced oil/lubricating system
• UL569/CSA8.3-listed flexible fuel hook-up
• Installation and start-up manual
• Operator’s manual
• Engine operator’s manual
• Installation checklist
• Two access door keys
• One spare 15A fuse
• 10 Pole control panel connector
• Remote LED indicator kit (red LED/plate/screws)

Not Supplied:
• 650 CCA starting battery (NOT deep-cycle)
• Connecting wire and conduit
• Fuel supply valves/plumbing

Required Specialty Tools/Equipment
• Two 60” lengths of 2” Schedule 40 pipe (NOT conduit)
• Lifting straps, chains or cables
• Hole punches for 7 ga steel
• Torque screwdriver, 5 to 50 inch-pound range
• Ignition Timing Light
• Air Fuel Ratio Meter (O2 Sensor and Analyzer)