Caron 6016 User Manual
Page 3
6014 & 6016 Operations Manual
Rev C 2/14/12
Page 3 of 56
TABLE OF CONTENTS
Section 1
– Warranty .................................................................................... 5
Section 2
– Equipment Overview ............................................................... 10
Section 3
– Installation ............................................................................... 12
Unpacking
Choosing a Location
Preliminary Cleaning
Installing the Port Stopper
Installing the Shelves
Leveling the Unit
Connecting the Drain Line
Connecting the Water Supply
Connecting Electrical Power
Section 4
– Optional Accessory Installation ............................................. 18
Connecting Alarm Contacts (ALRM301)
Installing the Carboy Water System (BOTL301)
Connecting Communications or Analog Outputs (DLUX303)
Installing Drain Water Pump (PUMP301)
Installing the Side Mounted Recorders (RCDR311 & RCDR312)
Installing the Stacking Kit (STCK301)
Section 5
– Operation ................................................................................. 24
Changing the Temperature Set-point
Changing the Humidity Set-point
Changing the CO2 Set-point
Running a Decontamination cycle
Section 6
– Optional Accessory Operation ............................................... 29
Using the Carboy Water System (BOTL301)
Operation of the Delux Controller System (DLUX303)
Built in Gas Guard System (GASG301)
Interior Electrical Outlet (OUTL301)
Operation of the Front 6” Mounted Recorders (RCDR301 / RCDR302)
Operation of the Fron
t 10” Mounted Recorders (RCDR303 / RCDR304)
Operation of the Side Mounted Recorders (RCDR305, RCDR306)
Section 7
– Calibration ............................................................................... 42
Calibrating the Temperature