beautypg.com

Carbolite VCF Series User Manual

Installation, operation & maintenance instructions, 1200°c vertical chamber furnaces vcf models

background image

MF25 – 3.09

Installation, Operation &

Maintenance Instructions

1200°C Vertical Chamber Furnaces

VCF models





This manual is for the guidance of operators of the above Carbolite products

and should be read before the furnace is connected to the electricity supply.

Manuals are supplied separately for the furnace controller

(and overtemperature controller when fitted).

Please read the controller manuals before operating the furnace.

C

ONTENTS

Section

page

1.0

Symbols & Warnings

2

2.0

Installation

3

3.0

Operation

5

4.0

Maintenance

7

5.0

Repairs & Replacements

8

6.0

Fault Analysis

11

7.0

Circuit Diagrams

12

8.0

Fuses & Power Settings

14

9.0

Specifications

15