Bakers Pride FC-816 Manual User Manual
Page 14

14
Anyone with some experience laying tile should be able to complete this project with relative ease.
Step #1
Uncrate oven(s), set in place.
Step #2
Attach front sheet metal skirt (provided) by drilling holes in oven legs using pre-punched holes in sheet
metal skirt as a template.
Step #3
Secure skirt using sheet metal screws.
Step #4
If you plan on finishing the oven sides with tile, etc, follow steps #2 and #3 for side skirts.
Step #5
Fasten 3/8” thick fire resistant “Wonder Board” (7mm) to oven front (and sides if appropriate) using 1/2” to
5/8” sheet metal screws. When finishing Lintel Plate, thinner “Wonder Board” and shorter screws may be
necessary.
Step #6
Attach tile, stone, thin-brick or the material of choice over “Wonder Board” using either a latex/polymer
based high-heat ceramic thin-set mortar, “spec” mix mortar or type “S” mortar. Best results will be achieved
using tile, etc. no more than 5/8” thick.
Step #7
Consider L-shaped tile or brick trim pieces along front vertical corners and top edges of oven front and side
to complete a finished look.
Step #8
Grout between brick joints. It is best to allow the thin-set mortar to dry over night prior to grouting.
Step #9
Allow grout to dry for 24 hours prior to starting ovens.
NOTE:
Wonder Board equivilents; Harde Backer Board, various trade names.
NOTE:
NOTE: “
NOTE:
Bottom flange on skirt faces outward.
Wonder Board” must be cut to fit. Allow access for push-pull rod holes, oven control access
doors and combustion and bake chamber doors.
Start at the floor and work up to top of oven. Cut stone, etc. to fit as required based on your design
and to create the look you want.
i
7
FC-616 DSP WITH TILEWORK
8
FC-616
STACKED ON Y-600 WITH TILEWORK
DSP
DSP STYLE INSTALLATION