4.4 Shimming And Anchoring Lift To Concrete

Recommended concrete anchor bolts are: HILTI “Kwik-Bolt”, Molly Parabolt or similar.

1. Verify lift is positioned correctly.

2. Drill holes in concrete as specified by anchor bolt

manufacturer.


3. Install and tighten anchors as specified by anchor bolt

manufacturer.


4. After lift has been aligned, leveled and shimmed, and

anchors have been installed, pour grout under entire
base frame.


5. When grout has set and cured, tighten nuts on anchor

bolts.


6. Route hydraulic hose or electrical cord through conduit

in pit wall.

4.5 Accordion Skirt Installation

1. Position platform in raised position. Engage maintenance locks (see “Lift Blocking Instructions”

section). Position accordion with weight rod pocket at bottom and mounting collar at top. The
breathable material when provided must be positioned at top of skirt with mounting collar.


2. Slip skirt over end of platform. Turn skirt as required to slide over other end of platform and leg

assembly. The skirt should be in position under platform while enveloping base assembly.


3. Select from the following mounting configurations.

Mounting Accordion Skirt On Platform Side

Raise one side of skirt along with a skirt-mounting bar (1/8”
x 1”) to (1) side of platform. When possible, center skirt-
mounting collar and skirt-mounting bar (1/8” x 1”) on
platform side.

Align pre-drilled holes in side of platform with skirt-mounting
bar holes and punch holes in skirt-mounting collar.

Push a nylon drive rivet through each hole in skirt-mounting
bar. Hammer aluminum pin into rivet until flush with rivet
head. Repeat mounting process for remaining sides of
accordion skirt.