beautypg.com

Step 8, Step 7 – Anchor EVENT AND VENUE LINER User Manual

Page 6

background image

6

Step 8

At eave line, hook liner eave hooks to eave cable as shown
in Figure 8. After all hooks are connected, raise liner to
fi nal position and tie off as shown in Figure 7b.

Figure 8

View looking up at eave.

Eave beam

Eave cable

Figure 6c

Eave Cable

Pull Rope

Figure 7a

Liner being raised.

Step 7

With one person holding each rope, pull the
liner up in unison until the ridge tubes are
above the eave line. Tie ropes off to bottom of
upright as shown in Figure 7b.

Figure 7b