beautypg.com

Flush mounting – classic bricks – 2N Helios IP Uni v2.1 User Manual

Page 14

background image

14

2N TELEKOMUNIKACE a.s., www.2n.cz

®

Flush Mounting – Classic Bricks

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

Cut a wall hole using the template enclosed.
Make sure that all the required cables are
available in the hole.
Unpack the plastic mounting box. Break out
the cable holes as necessary and make sure
that the wall hole is big enough for the box.
Wall up the mounting box making sure that
the box is aligned with the wall surface. Wait
until the plaster (mortar, mounting foam,
etc.) sets.
Unscrew the front panel from the door
intercom.
Connect the cables to the terminals or RJ
connector as described in the Electric

subsection.

Connection
You can use the cable tie for connection as
shown:

Mounting completion – after electric
installation!
Insert the intercom in the mounting box in the
wall.
Tighten the intercom with the stainless steel
screws included in the delivery. As the screw
holes are oval, you can perfect the vertical
position before tightening.
We do not recommend you to insert the
button tags now.
Replace the stainless steel front panel fixing it
with the stainless steel screws you unscrewed
in step 4 above.