Smittybilt N0482QC Nerf-Step User Manual
Installation instructions
WWW.SMITTYBILT.COM
For Technical Support/Warranty Information please call 310-762-9944
Smittybilt, 1600 Walnut Parkway, Compton, CA 90220
Installation Instructions
Nerf-Step (Part # N0482CC, N0482QC)
04-09 Nissan Titan Crew Cab 4-Door Short Bed
NOTE: Carefully read entire instructions thoroughly before attempting to install this part.
It is recommended to have some additional help while installing these bars.
Parts Included Qty
Tools Required
8mm x 1” bolts 4
13mm Ratchet with socket or Wrench
8mm nuts 4
5/16” Flat Washer 8
5/16” Lock Washer 8
Picture is for sample use, may not be actual bars
STEP 1:
Start by locating the driver’s side nerf step. To do so, locate the shorter tail bend. The short side goes to
the front of the vehicle.
STEP 2:
Locate the factory threaded holes, located under the door on the underside of the body of the vehicle.
NOTE: There will be black plastic caps covering the mounts. Remove all caps and discard.
STEP 3:
Hold the step up to the under body of the vehicle and align the factory studs in the body with the upper
mounts in the brackets of the nerf-steps. Install the two 8mm nuts, flat washers, and lock washers-hand
tighten.