beautypg.com

Synergy 5052 - Rear 4 Link Kit (Bronco, Jeep CJ, TJ, YJ, Universal) User Manual

Page 5

background image

SYNERGY MFG. 870 INDUSTRIAL WAY, SAN LUIS OBISPO, CA (805) 242-0397



14. Reinstall and tack weld the control arm brackets on the frame. Double check the

front to back location and make sure they are the same side to side.




AXLE LINK BRACKETS

15. Cut off all or any unwanted suspension brackets from the axle housing. Use a grinder

with a cut off wheel, plasma cutter or oxy-acetylene torch. Grind the welds smooth.

16. It is best to set the axle on jack stands with a jack supporting the pinion to set the

pinion angle. Adjust the pinion to your desired angle, 10-15 degrees is typical for this
type of application.

17. Position the lower control arm brackets on the axle tube. These brackets are made for

a 3" axle tube, you may need to modify them to fit your axle tube if it's a different
size. This is not a set location and is up to you to find the optimum position.