beautypg.com

CARR 210704 M-Profile Light Bar User Manual

M-profile light bar mounting instructions

background image

Quality and Style that Endures

Follow the diagram and the written

directions carefully for a proper,

safe installation.

Should you encounter an unusual,

unforeseen problem, contact our

Technical Help Line

7:00 AM – 3:00 PM Pacific Time

(951) 719-1068

Visit our web-site at

www.CARR.com

Carr Pattern Co., Inc.

WARNING!

THIS CARR LIGHT BAR IS DESIGNED TO HANDLE A TOTAL

WEIGHT OF FOUR (4) LBS. ANY ADDITIONAL WEIGHT

BEYOND THIS CAPACITY, MAY RESULT IN SERIOUS

DAMAGE TO YOUR VEHICLE AND/OR ANOTHER VEHICLE.

SPECIAL NOTE: VEHICLES NOT HAVING RAIN GUTTERS WILL REQUIRE RAIN GUTTER KITS:

#220042
‘05-’14 Toyota Prerunner /Crew Cab, ’07-’14 Toyota Tundra, ’05-’07 Toyota 4 Runner,07-14 FJ Cruiser
’09-’14 Dodge Ram 1500 All Cabs/All Doors
#220052 ‘04-’14 Chevy Colorado/GMC Canyon, ‘97-‘04 Dodge Dakota, ‘99-’14 Ford Super Duty All Cabs,

‘05-’14 Jeep Grand Cherokee, ’06-’09 Jeep Commander, ‘83-‘93 Mazda B-Series P/U, 98-’14 Nissan
Frontier Reg.Cab, ‘02-’14 Nissan Frontier Crew Cab, ‘00-’14 Nissan Xterra-w/o Option Roof Rack,
‘96-‘04 Toyota Tacoma/Prerunner/Crew Cab/4-Runner, ‘00-‘06 Toyota Tundra, ‘01-‘07 Toyota Sequoia

#220062 04-14 F-150
#220542 ‘00-’14 Chevy/GMC Sierra/Silverado C/K P/U/FS, ‘01-’14 HD, ‘02-‘09 Chevy TrailBlazer/Envoy

Avalanche/GMC/Denali Truck, ‘02-‘08 Dodge FS 1500 P/U & Quad, '03-’14 Dodge 2500/3500 P/U &
Quad, ’06-’14 Dodge Mega Cab 1500, ’06-’14 Dodge Mega Cab 2500/3500 Ram P/U

#223412 ‘88-‘99 Sierra Silverado C&K P/U/FS
#221502 ‘94-‘01 Ram 1500 P/U, ‘94-‘02 Ram 2500-5500

LIGHT BAR CUTTING INSTRUCTIONS
1. Two people will be needed to complete this task.
2. Place ONLY THE MOUNTING END CASTING into the rain-gutters of your vehicle.
3. Level each Mounting End Casting so that the top flat area is parallel to the horizon.
4. Take a tape measure and measure the distance between each open end of each Mounting End Casting .
5. Add 2 inches to that dimension.
6. Subtract that total from the total length of the bar, which is 56".
7. Take the difference and divide it by two.
8. The amount divided by two is the amount you will cut off each end of your bar.

MATERIALS NEEDED: Hammer,
center punch, pencil, tape measure, flat
blade screwdriver.
MATERIALS FURNISHED: One
hardware pack, two end castings, cross
bar, instruction page.

M-PROFILE LIGHT BAR MOUNTING INSTRUCTIONS

Part No’s: 210701, 210702 & 210704

¼” Bolts

Cross Bar

End Casting

Rubber Booties

5/16” Bolt

This is the open end of the Mounting End Casting.
Measure from this point on each Mounting End Casting.
(See below for the Light Bar Cutting Instruction)

“L” Shaped Stainless

Steel Bracket

This manual is related to the following products: