CHECKLIST—INSTALLATION

LOAD CALCULATION

____________

Heating Load (Btuh)

____________

Cooling Load (Btuh)

____________

Furnace Model Selection

COMBUSTION AND VENT PIPING

Termination Location

________

Roof or Sidewall

________

Termination Kit — 2 Pipe or Concentric

________

Combustion-Air Pipe Length

________

Combustion-Air Pipe Elbow Quantity

________

Vent Pipe Length

________

Vent Pipe Elbow Quantity

________

Pipe Diameter Determined from Sizing Table

________

Pipe Sloped To Furnace

Pipe Insulation

________

Over Ceilings

________

Low-Ambient Exposed Pipes

Condensate Drain

________

Unit Level or Pitched Forward

________

Internal Tubing Connections Free of Kinks
and Traps

________

External Drain Connection Leak Tight and
Sloped

________

Condensate Trap Primed before Start-Up

________

Heat Tape Installed if Required

CHECKLIST—START-UP

________

Gas Input Rate
(Set Within 2 percent of Rating Plate)

________

Temperature Rise Adjusted

Thermostat Anticipator

________

Anticipator Setting Adjusted or

________

Cycle Rate (3 Cycles per Hr) Selected

Safety Controls Check Operation

________

Primary Limit

________

Pressure Switch