beautypg.com

Team Associated RC8.2 User Manual

Page 3

background image

3

Bag L

30-33.........Fuel Tank, Air Filter, Engine, and

Pipe Installation

Bag M

34................Wheels, Tires, and Body Install

34.................Building Tips

35................Chassis Tips

35................Front End Tips

36................Rear End Tips

37.................Droop Settings

38-49.........Catalog

49.................Contact Info

50.................Notes

51.................Setup Sheet “Kit Setup”

52................1:1 Hardware “Fold Out

53................Setup Sheet “Blank”

54................Back Cover

:: Table of Contents

:: Notes

This symbols indicates a

special note or instruction

in the manual.

!

There is a 1:1 hardware foldout page in the back

of the manual. To check the size of a part, line

up your hardare with the correct drawing until

you find the exact size. Each part in the foldout

has a number assigned to it for ordering

replacement parts.

1....................Cover

2....................Introduction

3....................Table of Contents

BAG A

4....................Chassis Assembly

BAG B

4-5................Steering Assembly

Bag C

6-9................Front, Rear, and Center

Differential Assembly

Bag D

9-11.............Front Bulkhead Assembly

Bag E

11-14..........Front Suspension Assembly

Bag F

15-16..........Rear Bulkhead Assembly

Bag G

16-19..........Rear Suspension Assembly

Bag H

20-21..........Wing Assembly

Bag I

21-22..........Center Bulkhead Assembly

Bag J

23-25.........Shock Assembly

Bag K

26-30.........Radio Tray Assembly

Associated Electrics, Inc.

26021 Commercentre Dr.

Lake Forest, CA 92630

http://www.TeamAssociated.com · http://www.RC10.com · http://twitter.com/Team_Associated · http://bit.ly/AEonFacebook

Customer Service

Tel: 949.544.7500

Fax: 949.544.7501