Trim end balusters & install swing brackets, Now drill, Mark and drill for bottom bracket flange – AZEK Straight Rail User Manual
Page 3: Install bottom bracket flange, Install center support bracket, Straight rail installation guidelines for, Page 3

STRAIGHT RAIL INSTALLATION GUIDELINES for
AZEK Premier
AZEK Trademark
AZEK Reserve
Page 3
Back out end baluster screws
1/2 turn to allow baluster to
swing in step
Tip
13
X2 End Baluster Assy.
Rail assemblies
from step #
5
X 2
X 2
X 2
Trim
3
/
8
” off
Balusters to
make room
for swing
brackets
Assemble Rail Section:
Fasten Balusters to
Top Retainer &
Bottom Rail
6a
Trim End Balusters
& Install Swing
Brackets
6b
3
Rail
assemblies from
step #
5
6b
Assemble Rail Section:
Fasten Balusters to Top Retainer & Bottom Rail
3
IMPORTANT:
Be sure to only
drill through
Post Sleeve
Now Drill
with
3
/
16
”
Drill Bit
8
Mark
and
Drill for
Bottom
Bracket
Flange
For most
locations, install
Bottom Bracket
Flange 4
1
/
16
”
from the deck
surface
For installation
in Florida or
Canada, mark
Bottom Bracket
Flange 2
1
/
16
”
from the deck
surface
Make sure bottom bracket
is angled down for
access in step
14
IMPORTANT:
Do not over
torque screws
when fastening
bracket to posts
as this may
cause post
sleeves to crack
9
Install Bottom
Bracket Flange
Rail assembly
from step 6
or
7
Install
Center
Support
Bracket
3
8
TIP
For most applications,
use the 4
3
/
8
” support.
For installation in Florida
or Canada, use supplied
2
3
/
8
” Center Support
If NOT using swing
bracket, skip to step
(Determined in Step )
Bottom Rail 2nd
Top Retainer 1st
Top Retainer 1st
Bottom Rail 2nd
If using swing bracket, ignore this step
(Determined in Step )
IMPORTANT
Make sure that the
DRIVE TOOL/DRILL
is configured or set
to use the SCREW
setting when
driving and/or
tightening all
FASTENERS.
NOTE:
Swing brackets will NOT
work with Reserve balusters!
© 2013 AZEK Building Products. All rights reserved