Group sequences, Local monitor seize, Group sequence operation – Panasonic WV-ASC970 - User Manual
Page 11: Group sequence priority, Alarm programming and handling, Program the alarm, Control alarm, Control alarm action
11
■
Group Sequences
●
Local Monitor Seize
The system allows operators to start and control a group sequence in only local domains. Before starting a group
sequence operation, a local monitor must be seized. Be sure that the group sequence monitors are not seized by
operators with higher priority.
●
Group Sequence Operation
Group Sequence operations include start, stop, pause, run, next step, and previous step. (Refer to p. 33.)
●
Group Sequence Priority
If another operator with higher priority has seized a Group Sequence monitor, that monitor will maintain the original
operator priority.
Note:
• Group Sequence monitors should be the same in each step of sequence and less than 33.
• During 3 seconds dwell time in case of WJ-GXD400, the video and OSD display will delay according to switch-
ing channel numbers.
■
Alarm Programming and Handling
●
Program the Alarm
This function allows administrators to program alarms, assign alarm display targets, and define alarm actions.
●
Control Alarm
Alarm controls are operator functions. These functions allow the highest priority operator to seize the alarm and
control it. These functions also allow the next highest priority operator to gain control after the highest priority oper-
ator releases the alarm.
The alarm controls include:
• Arm and disarm alarms
• Acknowledge active alarms
• Reset acknowledged or active alarms
The system also supports automatically resetting and acknowledging alarms through configuration by the Admin
Console.
●
Alarm Action
The system supports the following alarm actions:
• Camera spots
• Tour sequences
• Group sequence
• Text display (Only WJ-SX650 or WJ-SX850 switch node)