beautypg.com

American Standard SPEED CONNECT 4508.4 User Manual

Page 2

background image

M968845 Rev. 1.2

POP-UP DRAIN

Tighten TAILPIECE (4) on DRAIN BODY before
installing DRAIN BODY.

Fig. B.

7

3

5

4

FLANGE GASKET

Check DRAIN FLANGE in BIDET to ensure that WHITE
FOAM GASKET (1) is fully compressed and not visible.

Fig. A.

DRAIN

FLANGE

1

WHITE FOAM
GASKET
NOT VISIBLE

Insert LIFT ROD GUIDE (1) and CABLE CONNECTOR (2)

through rear hole, making sure SEAL WASHER (3) is
properly seated. Fig. B.

From below slip slot in MOUNTING NUT (4) over CABLE (5).
Thread NUT (4) onto lift rod guide shank to secure ROD
GUIDE (1) to bidet. Hand tighten only. Fig. B.

1

2

4

3

ILLUSTRATION
SHOWN LESS
VALVES

SLOTTED
MOUNTING
NUT

POP-UP ROD ASSEMBLY

2

TIGHTEN LOCKNUT

1

Fig. A.

Fig. B.

REMOVE FLANGE

Thread FLANGE (1) counter-clockwise and remove
FLANGE (1) and FOAM GASKET (2) from drain
body.

Fig. A.

Remove CLEAR PLASTIC COVER (1).

Remove CARDBOARD SPACER (2) from under
DRAIN POP-UP (3).

2

3

1

Tighten LOCKNUT (1) firmly with Adjustable
Wrench or Channel Locks.

2

INSTALL DRAIN FROM

BELOW FIXTURE

6

From under side of BIDET
install DRAIN BODY (1) up
through drain outlet.

Note: No plumber’s putty
or caulk is required.
The CABLE ATTACHMENT
POINT (2) must face towards
the rear of the BIDET.

DRAIN

OUTLET

Install FOAM GASKET (3) and
FLANGE (4) onto drain body
from above BIDET and tighten
FLANGE (4) firmly.

1

4

3

4

Fig. B.

Fig. A.

Fig. B.

2

3

1

Fig. A.

DRAIN

BODY

4