beautypg.com

American Standard CADET 3985 User Manual

Installation instructions, Deck-mount bath filler, 3985 series

background image

DECK-MOUNT

BATH FILLER

Installation

Instructions

M968236 Rev.1.2

Certified to comply with ANSI A112.18.1M
U.S. Patent No. 5,819,789; D405,165

Required Tools

*Supplied with Fitting

*Hex key

RECESS

Turn off hot and cold water supplies before beginning.

CAUTION

1

2

Insert SPOUT SHANK (1) through center hole of MOUNTING LEDGE.

Make sure that the RUBBER RING (2) is properly seated in RECESS

at base of SPOUT (3).

Assemble RUBBER WASHER (4) and BRASS WASHER (5) onto

SHANK (1). From underside of ledge secure SPOUT (3) into position

with LOCKNUT (6).

SPOUT ASSEMBLY

PREPARE TUBE AND TEE ASSEMBLY

3

4

2

3

1

3

4

1

2

4

6

5

Prepare TUBE and TEE ASSEMBLY (1) to fit center to center

VALVE (2) location (between 6-1/2" and12"). If necessary,

cut and/or bend TUBING carefully. Make sure tube bend is

close to the TEE (1) so that it will not effect the compression

joint at the VALVE CONNECTION.

Remove COUPLING NUT (3) and FERRULE (4) from each

VALVE (2) and slide onto TUBING (5).

ADJ. 6-1/2 TO 12

5

Flat Blade Screwdriver

Adjustable Wrench

Channel Locks

3985 Series

MOUNTING

LEDGE.

VALVE inlet is 3/4-inch NPT male connector.

NOTE

T M

1-1/4

MAX.

3

(H)

(C)

1-1/8 D.

MOUNTING

SURFACE

ADJ. 6-1/2 TO 12

1-1/16 D.

4-3/4

7-1/4

6-5/8

4

3/4-14 MALE

N.P.T. INLETS

Thank you for selecting American-Standard...the benchmark

of fine quality for over 100 years.

To ensure that your installation proceeds smoothly--please

read these instructions carefully before you begin.