beautypg.com

Press, How to put the ups in maintenance bypass operation – APC SYMMETRA PDUM160H-B User Manual

Page 15

background image

Operation: Operation Procedures

990-3015-001

Symmetra PX 160 kW 400 V Operation

9

Set the upstream mains power to the OFF or LOCKED OUT position. If the UPS has a dual mains

supply, set both supplies to the OFF or LOCKED OUT position.

Electrical Hazard:

Follow proper Lockout/Tagout procedures to remove access to the

unit and physically label the unit as intentionally out of service.

How to turn the load on/off using the display interface

How to put the UPS in maintenance bypass operation

Use the display to put the UPS into bypass.

Confirm the transfer into bypass is complete.

Note: The H3 LED next to the Q3 switch on the PDU-XR will illuminate, indicating that

it is safe to operate the Q3 switch.

Set the Q3

switch on the PDU-XR to the ON position.

Note: The H2 LED beside the Q2 switch will

illuminate, indicating that it is safe to

operate the Q2 switch.

Press

Press

Press

UPS

Alarms

Power Dist
Switch Gear
Environment

Log
Admin
Help

UPS Power Control
UPS Status
UPS Tests & Diags
UPS Configuration

Turn UPS Off
Reboot UPS
UPS Into Bypass
UPS To Sleep

Press

Press

Press

Press

UPS

Alarms

Power Dist
Switch Gear
Environment

Log
Admin
Help

UPS Power Control
UPS Status
UPS Tests & Diags
UPS Configuration

Turn UPS Off
Reboot UPS
UPS into Bypass
UPS to Sleep

Confirm:
UPS into Bypass?
NO, ABORT
YES, Into Bypass

Putting UPS Into
Bypass, please
wait...

UPS is now in
bypass, press any
key to return to
previous menu

This manual is related to the following products: