beautypg.com

Verifying the installation – Allied Telesis AT-CV1203 User Manual

Page 35

background image

AT-CV1203 Chassis Installation Guide

35

Verifying the Installation

After powering on the chassis, view the PWR GOOD LED. The LED
should be ON. The PWR A and PWR B LEDs should also be ON for DC
connectors that are connected to power adapters. If an LED is OFF,
perform the following:

ˆ

Verify that the power cord is firmly connected to the AC power source
and to the power adapter.

ˆ

Verify that the power adapter is firmly connected to a DC connector on
the back panel of the chassis.

ˆ

Verify that the power source is operating properly by plugging a
different device into it.

ˆ

Try connecting the power adapter to another power source, preferably
located on a different circuit.

ˆ

Try using a different power adapter and power cord.

ˆ

Check that the voltage from the power source is within the required
levels for your region.

For instructions on how to troubleshoot a problem with a line card, refer to
the documentation that ships with the card.