beautypg.com

Figure 4. at-gs900/8ps switch items – Allied Telesis AT-GS900/8PS User Manual

Page 36

background image

Chapter 2: Installation

36

3. Verify that the shipping container includes the AT-GS900/8PS Switch

and the items shown below in Figure 4.

Figure 4. AT-GS900/8PS Switch Items

Two equipment brackets
(for wall or rack

installation)

Eight bracket screws (for
wall or rack installation)

Four wall anchors (for wall

mount installation)

Four screws and washers

(for wall mount installation)

Four rubber feet (for
desktop installation)

One regional AC power
cord

One SFP slot dust cover
(pre-installed)

Four screws (for rack
mount installation)