beautypg.com

Unpacking the switch – Allied Telesis AT-GS900/8PS User Manual

Page 35

background image

AT-GS900/8PS Switch Installation Guide

35

Unpacking the Switch

To unpack the switch, perform the following procedure:

1. Remove all of the components from the shipping package.

Note

Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.

2. Place the switch on a level, secure surface.