Attach the stem, Attach the monorail circle, Save these instructions – LBL Lighting MO Chandelier Single Tier Round Surf Xfmr User Manual
Page 4

4
SAVE THESE INSTRUCTIONS!
7400 Linder Ave, Skokie, IL 60077
800.323.3226 - 847.626.6300
www.lbllighting.com
© 2008 LBL Lighting.All rights reserved.The "LBL Lighting" graphic is a
registered trademark of LBL Lighting. LBL Lighting reserves the right to
change specifications for product improvements without notification.
A Generation Brands Company
3
Slide each stem into one of the power posts on the
transformer cover.
Tighten both set screws in the power posts to secure the rods.
These set screws must be
.
very tight
4
2C
1
1
For 120” stems: Slide the separator down the rods until it
rests on the joining posts.
2A
SEPARATOR
JOINING POST
ROD
1
2
For 120” stems:
very tight.
Attach additional rods to the joining posts.
Insert each rod into a joining post and tighten the set screws
on the post.These set screws must be
2B
JOINING POST
ROD
SEPARATOR
SET SCREW
2
Push the Monorail hub completely onto the end of the stems.
Tighten the set screws on either side of the hub.These set
screws must be very tight.
3A
STEM
MONORAIL HUB
SET SCREW
SET SCREW
(BEHIND)
ROD
SET SCREW
3
Slip each cable grip under the Monorail.Tighten the set screw
to hold it in place.
Feed each aircraft cable through a cable grip.
Once all cables are through a cable grip, pull on the excess
cable at each cable grip to put even, gentle tension on all the
cables.
Cut off any excess cable.
Refer to the instructions provided with the chandelier heads
to attach the heads to the Monorail.
3B
1
MONORAIL
SET SCREW
EXCESS CABLE
Attach the Stem
4
5
6
2
CABLE GRIP
AIRCRAFT CABLE
7
Attach the Monorail Circle
3
4
1
2
1