Operation, Power up action, 3 operation – Videoswitch CMOR Vi-D5000 Dome User Manual
Page 23: Vi-d5000 ir dome

Vi-D5000 IR Dome
Videoswitch Page
18
VD601A.DOC
3 Operation
3.1 Power Up Action
When initialising the system, the operation run in 2 seconds.
When restoring out-of-factory settings, please wait patiently. The
operation will run for 1 minute.
This left figure shows the initialising state of the pan/tilt motor of speed
dome camera.
The initialisation of pan/tilt motor is complete.
Dome firmware is now detecting camera module type and
initialising it.
Power up self-testing is complete.
IR CAMERA
PROTOCOL PELCO-D/P
COMM 2400.N.8.1
DOME ID
001
MODULE
VERSION V1.2
PAN MOTOR
OVER
TILT MOTOR
OVER
POWER ON
IR CAMERA
PROTOCOL PELCO-D/P
COMM 2400.N.8.1
DOME ID
001
MODULE FCB-EX980P
VERSION V1.2
PAN MOTOR
OVER
TILT MOTOR
OVER
POWER ON
IR CAMERA
PROTOCOL PELCO-D/P
COMM 2400.N.8.1
DOME ID
001
MODULE
VERSION V1.2
PAN MOTOR
INIT
TILT MOTOR
INIT
POWER ON