beautypg.com

Top cable entry, Loosen the 8 bolts to remove top cover – American Power Conversion Symmetra MW User Manual

Page 23

background image

Electrical Installation: Bypass Static Switch Wiring

Symmetra MW 1000 kW 480 V Installation - 990-4112E

19

Top cable entry

Loosen the 8 bolts to remove top cover.

Drill holes for conduits. Re-fit the covers. Install the conduits.

Feed cables through conduits. Connect cables at cable connection points as illustrated.

Connect grounding electrode conductor to busbar locations as shown.

Note

No drilling or cutting should take place over the top of the UPS.

2.3 in / 58 mm

1.75 in /
44.45 mm

1.75 in /
44.45 mm

X022

X021

X007

X010

X011

X008B

X008A

X012

X013

X014A

X014B

X017

X405

~

~

Normal

UPS Summary

Normal

L1 IN

L2 IN

L3 IN

L1 OUT

L2 OUT

L3 OUT

L1 IN

L1 OUT

L2 IN

L2 OUT

L3 IN

L3 OUT

PE

Top view of top cable entry

Port for communication cables

Top view of AC IN & OUT cable
connections