Top cable entry, Preparing for top cable entry (default) – American Power Conversion Symmetra MW User Manual
Page 13
Symmetra MW 1000 kW 480 V Installation - 990-4112E
9
Top Cable Entry
Preparing for top cable entry (default)
Cable entry in top cover of Input/Output Section.
Loosen the 8 bolts in cable entry covers. Drill holes for conduits in areas shown. Re-fit the
covers and install the conduits.
Install cable lugs on busbars. Use M12 bolts.
L2 IN
L1 IN
L3 IN
L1 OUT
L2 OUT
L3 OUT
AC IN
AC OUT
BAT 1
BAT 2
92
93
95
90
91
94
L3 OUT
L2 OUT
92
93
90
91
94
95
L1 OUT
L3 IN
L2 IN
L1 IN
2.3 in / 58 mm
1.75 in /
44.45 mm
1.75 in /
44.45 mm
IN/OUT power cable (top entry)
AC IN cable
entry
AC OUT
cable entry
Battery
cable
entry
Battery
cable
entry
Top view
M6 Bolt
Top view
See also other documents in the category American Power Conversion Tools:
- 5000VA (25 pages)
- MX28B-400 (46 pages)
- CTEG4-240MB-5 (7 pages)
- 200/208 V (52 pages)
- VS 100 (54 pages)
- SMARTUPS 700 (60 pages)
- AP7562J (24 pages)
- 100VAC (18 pages)
- Smart-UPS VT (56 pages)
- 1400XLT (30 pages)
- 350/550 (2 pages)
- SURTA1500XLJ (16 pages)
- RT-UXI (20 pages)
- 208 Vac (17 pages)
- 2200 VA (17 pages)
- 1500VA (18 pages)
- Smart-UPS (36 pages)
- 60-80kW 208/480V (34 pages)
- 420 (3 pages)
- 220 VAC (21 pages)
- 350 (2 pages)
- AP9215 (20 pages)
- Back-UPS CS 500 (2 pages)
- PDU (54 pages)
- Airless Paint Sprayer 68001 (24 pages)
- AP7610 (16 pages)
- AP7902 AP7911 (26 pages)
- UPS (2 pages)
- RT XLI/XLICH (34 pages)
- 990-2233A (19 pages)
- 208/220 (48 pages)
- NS 600 (2 pages)
- SYMF800KH (54 pages)
- 20-30 kVA 480V (4 pages)
- 100 VAC (25 pages)
- 750 (17 pages)
- 3000 (23 pages)
- MX28B200 (61 pages)
- RS 1000 (2 pages)
- 200-240 VAC (21 pages)
- 5000RMB (23 pages)
- 480kW400V (32 pages)
- AP9825I (1 page)
- 250/450 (2 pages)
- SUA48RMXLBP3U (8 pages)