2.7 Routing PV & Luminaire Cables

1.

Open Battery Enclosure.

2.

Insert the PV cable and Luminaire cables into access hole on the battery
enclosure, as shown in Figure 9.

3.

Position the cables so they extend inside the battery box at least 12 inches (30.5
cm).

Your battery enclosure may include a hinged cover and an
optional locking key device.

FIGURE 9

MOUNTING B.E. & ROUTING CABLES

Cables from LED
Luminaire & PV
Module

FIGURE 10

MOUNTING CONTROLLER

Flush studs for hardware

Controller

2.7 Attaching Controller to Battery Enclosure

1.

The controller needs to be installed on the inside of the battery box cover.

2.

Remove controller from packaging and remove hardware on controller.

3.

Place controller on battery box cover over flush studs and secure with supplied
hardware (Figure 10).