Sol GreenWay Solar Path Lighting User Manual
Page 18

18
MKTG-IM-GWY-03-EN-0513
Installation Manual | Greenway
®
Solar LED Path and Trail Lighting System
Fuse Replacement
If the fuse needs to be replaced, be sure to also check operation of the controller.
1.
Open the battery box and remove the fuse cover on the fuse holder.
2.
Remove the existing fuse, insert the new fuse, and replace the fuse cover.
3.
Test the system and close the battery box.
LED Fixture Replacement
1.
Remove the LED fixture from the arm and disconnect plugs.
2.
Install the new LED fixture, following the install procedure.
The LED in the fixture is not serviceable. The entire LED fixture assembly must be
replaced.
3.
Test the system.
Battery Replacement
1.
Open battery box cover and disconnect the solar panel harness connector from the
controller, then disconnect the battery cable from each battery.
2.
Remove the battery(s) from the battery box.
3.
Place the new battery(s) and plug the battery cable into each battery, then plug the solar
panel into the controller connector.
4.
Test the system, then close the battery box cover.